亚洲乱亚洲妇无码|欧美日韩一区二区综合|日韩成人高精品一区二区|久久一区二区三区免费播放|99国产精品视频免费观看|91国内在线观看在线观看|91麻豆精品国产综合久久久|日本婷婷99精品国产91久久

歡迎訪問永誠廣建公路材料(山東)有限公司網(wǎng)站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 公司新聞

公司新聞

瀝青混凝土拌制原理以及符合哪些要求

來源:http://www.yinyudi.com/ 日期:2022-07-13
瀝青砼路面質(zhì)量受人員、材料、設(shè)備、技術(shù)工藝及水平、環(huán)境等多種因素,以及其他方面,施工單位應(yīng)嚴格按照批準的施工組織設(shè)計以及規(guī)范要求進行正確有序地施工才能保證獲得合格的瀝青砼路面。下面來講講瀝青混凝土拌制原理以及符合哪些要求吧。
The quality of asphalt concrete pavement is affected by many factors such as personnel, materials, equipment, technical process and level, environment, and other aspects. The construction unit should carry out correct and orderly construction in strict accordance with the approved construction organization design and specification requirements in order to ensure the qualified asphalt concrete pavement. Now let's talk about the mixing principle of asphalt concrete and what requirements it meets.
瀝青砼拌制過程中瀝青混合料時而會出現(xiàn)質(zhì)量不穩(wěn)定或波動性大,諸此任何一種瀝青混合料,在規(guī)范化、機械化的流水作業(yè)施工中,都是很難保證瀝青砼路面的質(zhì)量。例如,混合料溫度不均勻或者原各種不同規(guī)格礦料組成的變異性大或生產(chǎn)過程中沒有經(jīng)常檢驗各種不同規(guī)格礦料的顆粒組成,將導(dǎo)致流值、孔隙率的變化,從而影響路面質(zhì)量。
In the process of asphalt concrete mixing, asphalt mixture sometimes has unstable quality or large fluctuation. Therefore, any kind of asphalt mixture is difficult to ensure the quality of asphalt concrete pavement in the standardized and mechanized flow construction. For example, the uneven temperature of the mixture, the large variability of the composition of the original mineral materials with different specifications, or the particle composition of mineral materials with different specifications is not often tested in the production process, will lead to changes in flow value and porosity, thus affecting the quality of the pavement.
因此施工時應(yīng)每天進行抽取篩分試驗,并將結(jié)果匯縱進行分析,使之成為指導(dǎo)生產(chǎn)的依據(jù),并要求及時調(diào)整冷料倉比例;必須嚴格控制拌合樓的震動篩篩孔尺寸。實踐證明,按下列尺寸控制的篩孔為宜。
Therefore, during construction, sampling and screening tests should be carried out every day, and the results should be summarized and analyzed to make it a basis for guiding production, and the proportion of cold silo should be adjusted in time; The size of the vibrating screen hole of the mixing plant must be strictly controlled. Practice has proved that it is appropriate to control the mesh size according to the following dimensions.
濟南瀝青砼
1#篩=級配控制很大粒徑+(1-2)毫米2#篩=(級配控制很大粒徑-5毫米)/2+(1-2)mm3#篩=5mm+(1-2)mm4#篩=3mm依此可做適當調(diào)整,如何同三線冠新段AC25瀝青砼選擇篩孔為33、16、6、3的振動篩效果較好。為保持瀝青砼混合料應(yīng)有的質(zhì)量,我們專職試驗監(jiān)理人員進行日常產(chǎn)生過程中的檢驗,發(fā)現(xiàn)問答題及時糾正處理。
1 # sieve = grading control large particle size + (1-2) mm 2 # sieve = (grading control large particle size -5 mm) /2+ (1-2) mm3 # sieve =5mm+ (1-2) MM4 # sieve =3mm, which can be adjusted appropriately. How to choose the vibrating sieve with sieve holes of 33, 16, 6 and 3 with AC25 asphalt concrete in the new section of the third line crown has a better effect. In order to maintain the proper quality of asphalt concrete mixture, our full-time test supervision personnel carry out the inspection in the daily production process, and correct and deal with the problems found in time.
濟南瀝青砼廠家提醒,瀝青混合料的拌制應(yīng)符合下列要求:
Jinan asphalt concrete manufacturer reminds that the mixing of asphalt mixture should meet the following requirements:
(1)根據(jù)配料單進料和拌制,嚴格控制各種礦料和瀝青用量。(2)控制各種材料和瀝青混合料的加熱溫度。(3)拌和后的瀝青混合料均勻一致,無花白、無粗細料分離和結(jié)團成塊等現(xiàn)象。(4)每班抽樣做瀝青混合料性能、礦料級配組成和瀝青用量試驗。(5)每班拌和結(jié)束時,清潔拌和設(shè)備,放空管道中的瀝青。作好各項檢查記錄,不符合規(guī)定技術(shù)要求的瀝青混合料應(yīng)禁止出廠(場)。
(1) Feed and mix according to the batching list, and strictly control the consumption of various mineral materials and asphalt. (2) Control the heating temperature of various materials and asphalt mixtures. (3) The asphalt mixture after mixing is uniform, without hoarding, separation of coarse and fine materials and agglomeration. (4) The asphalt mixture performance, mineral aggregate grading composition and asphalt dosage test shall be carried out by sampling in each shift. (5) At the end of each shift, clean the mixing equipment and vent the asphalt in the pipeline. All inspection records shall be made, and asphalt mixtures that do not meet the specified technical requirements shall not be allowed to leave the factory (site).
以上就是今天為大家介紹的關(guān)于問題以及注意事項的全部內(nèi)容,希望對大家能有所幫助,想要了解更多內(nèi)容可以電話聯(lián)系我們或者關(guān)注我們的網(wǎng)站http://www.yinyudi.com,我們的工作人員會及時與您取得聯(lián)系。
The above is all about the problems and precautions introduced to you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://www.yinyudi.com , our staff will contact you in time.
  • 上一條:路面機械設(shè)備的購買和使用有講究
  • 下一條:瀝青冷補料施工時需要注意的事項
  • 相關(guān)產(chǎn)品: